Generating reports on the balance of NOV-2 and NOV-5 information exchanges (NAF)
You can run a utility that reports on the balance of information exchanges used on needlines in NOV-2 operational node connectivity diagrams with the information exchanges used by ICOM arrows on NOV-5 activity diagrams.
Prerequisite
There must be at least one NOV-5 activity model and a corresponding NOV-2 operational node connectivity diagram in the current encyclopedia. The symbols in each diagram must be defined and the appropriate information present for comparison.
In the NOV-2 and NOV-5 diagrams that you select, the following balancing operation checks are performed:
•Needlines without information exchanges
•Information exchanges without corresponding needlines
•Information exchanges on needlines not used on the activity model
•Information exchanges to operational activity validation
•Source operational activity and operational node discrepancies
•Destination operational activity and operational node discrepancies
•Source or destination operational activity and operational node
To generate balance OV2 and OV5 information exchanges reports
1 Click Tools > NAF Utilities.
2 Select Balance NOV-2 and NOV-5 Info. Exchanges.
A list of top-level NOV-5 activity diagrams and NOV-2 operational node connectivity diagrams is displayed.
3 Select one NOV-5 diagram and one NOV-2 diagram from each list for balancing.
4 Click Run.
Result
The report is generated in a Microsoft Word document with a list of the balance check results.