The Resource Map Viewpoint shows a structured overview of the resources of the enterprise – by drawing Resources inside higher-level Resources they belong to in a box-in-box format.
▪You can run analytics on the Resource Map to automatically create a Heat Map to identify areas of investment.
▪You can optionally show the relationship between Resources and the Capabilities they are assigned to.
The ArchiMate elements that can be drawn on this diagram are:
▪Resource
▪Capability
▪Work package
How to construct the diagram and build Heat Maps
The Resource Map is constructed in a similar way to the ArchiMate Capability Map (see ArchiMate Capability Map Viewpoint) – except Resources are placed inside other Resources. You may also create a Heat Map of Resources in a similar way to building a Heat Map of Capabilities on the ArchiMate Capability Map.