Architecting and designing : DoDAF : DoDAF 2 : Creating enterprise models using DoDAF 2 Viewpoints : Building DoDAF 2 models for the Operational Viewpoint : OV-06 Operational Activity Sequence and Timing diagrams : OV-06c Performers Event Trace diagrams (DM2)
  
OV-06c Performers Event Trace diagrams (DM2)
The Performers Event Trace (DM2) diagram shows the sequence and timing of the OV-2 Operational Resource Flow (DM2), which contains Performers with time sequence of Resource Flows. The diagram also shows the sequence and timing of an OV-5b Operational Activity Model (DM2), which contains Activities and ActivityResourceOverlaps.
Note Beginning with System Architect 11.4.2, the OV-06c Activities Event Trace (DM2) diagram and the OV-06c Performers Event Trace (DM2) diagram replace the OV-06c Event Trace (DM2) diagram.
You can draw the following symbols on the diagram: Performers, Need Line (DMxr), and Resource Flow (DMxr).
See also
OV-06 Operational Activity Sequence and Timing diagrams