Architecting and designing : Federal Enterprise Architecture Framework (FEAF) : FEAF 2 : Collaborative Planning Method (CPM) reporting
  
Collaborative Planning Method (CPM) reporting
With the FEAF 2 add-in, System Architect provides reports out of the box to help with stage 3 of the FEAF 2 Collaborative Planning Method. To open and run these reports, perform the following steps:
1 Select Reports > Report Generator.
2 Select File > Open Report File.
3 Navigate to System Architect’s Reports directory, normally located at <C>:\Program Files (x86)\UNICOM Systems\System Architect Suite\System Architect\Reports and select the FEAF2.rpt file to open it.
4 Run one of the FEAF 2 report files provided (or create your own by selecting Add and operating the GUI):
Report type
See
See also
Overview
Getting started
Using the reference models
Collaborative Planning Method (CPM)
FEAF 2