Architecting and designing
>
Business Process Analysis (BPA)
>
Activity Based Costing
> Tools and methods for ABC
Tools and methods for ABC
There are two methods by which you can implement Activity Based Costing (ABC). The ABC feature supports the allocation method for two diagram types.
See also
Hierarchy of activities in ABC
Tracing method for ABC
Allocation method for ABC
Tools for ABC allocation
Activity Based Costing
This site works best with JavaScript enabled