Architecting and designing > Business Process Analysis (BPA) > Simulation of Process Models > Simulating Process Chart diagrams > Flow break
  
Flow break
The purpose of a Flow Break Symbol is to pause or delay the Objects for a specified amount of time. No work is processed and there are no attending resources.
The following Simulation properties apply:
Capacity
Maximum size of 65535, which can be reduced.
Minimum and Maximum Delay Lengths
Select how long this profile will last.
Distribution button
Enables the Distribution wizard to assist in the entering of common distributions types and user defined distributions. Distributions are automatically added to applicable fields through the use of a wizard that guides the user through the creation of the syntax.
Variable
Represents a predefined value attribute can be reused across the model.
Revenue Scaler
Incur a cost for the process.
Scrap (continue in model)
Objects exceeding the maximum time can either exit the model (scrap) or inherit an attribute of “Rejected” that can be used in object routing.
See also
Simulating Process Chart diagrams