The Pr – Configuration Management viewpoint of NAF v4 is a Gannt-like diagram that enables you to map the Milestones of the lifecycle of a System against a timeline.
You may model a System as a timeline with its Milestone dates represented as circular pies. Each pie piece represents the status of a Thread of the System at that Milestone. Threads are:
▪Doctrine.
▪Training.
▪Leadership and Education.
▪Facilities.
▪Organization.
▪Material.
▪Personnel.
▪Policy.
The color of the pie slice represents the status of each Thread:
▪Critical Issues: Red.
▪No Outstanding Issues: Green.
▪Manageable Issues: Yellow.
▪Not Specified: White.
▪Not Known: Grey.
▪Not Required: Black.
CapabilityConfigurations
You may run the report named Cr – Capabilities and their CapabilityConfigurations Over Time to show Capabilities and the CapabilityConfigurations (see CapabilityConfiguration) that enable them over time. Each CapabilityConfiguration can have a set of ResourcePerformers that make them up.