Architecting and designing : NATO Architecture Framework (NAF) : NAF v3 : Running NAF 3 utilities : Generating NOV-2 operational node connectivity diagrams from an existing Operational Node (NAF)
  
Generating NOV-2 operational node connectivity diagrams from an existing Operational Node (NAF)
Generating NOV-2 operational node connectivity diagrams from an existing Operational Node
You can run the Operational Node to NOV-2 Operational Node Connectivity utility to generate NOV-2 operational node connectivity diagrams from an existing operational node. When you run the utility, the appropriate operational nodes are located, placed on the diagram, and then connected with the appropriate need lines.
Prerequisite
An NOV-2 diagram must exist with the operational nodes and need lines.
Procedure
1 Click Tools > NAF Utilities.
2 ClickOperational Node to NOV-2.
All operational nodes in the current encyclopedia are presented.
3 Select one or more of these definitions from the list box.
4 Click Run.
5 Enter a name for each diagram to be created; then click OK.
Result
One or more NOV-2 Operational Node Connectivity diagrams with Operational Node symbols and their corresponding Need lines.
See also
Running NAF 3 utilities