What is the user allowed to control?
The user is allowed to control:
▪The color of phases.
▪The vertical positioning of projects.
▪The horizontal positioning of milestones (through milestone date and the scope specified by the start and end date of the timeline).
▪The size of symbols (though width of projects is tied to width of timeline).
▪The spacing between projects.
▪The location of labels.
▪The paths of dependencies.