Customizing the metamodel : Diagrams: Creating and modifying : Creating roadmap-style diagrams : Diagram
  
Diagram
This is a diagram that represents the development of a set of Projects over a selected time scale. The time scale in the example is oriented horizontally.
Summary of diagram features
 
A Time Scale symbol indicates the period over which the Project development is shown.
Each Project symbol is depicted as a rectangle with a corresponding Time Bar located horizontally alongside it.
Users are not allowed to reposition milestone symbols manually or to drag milestone definitions onto the diagram. Instead, the positioning of the Milestones should be determined by (a) the date value for the Milestone and (b) the Time Scale chosen for the diagram. By default, phase colors are defined by the project and the underlying milestones but can also be defined by settings in the topmost project. However, the user may allocate the color of a phase.
A Milestone symbol is shown as a colored piechart-style icon that indicates the maturity of the Project in terms of up to eight segments. The Segments are colored indicating the status of a particular Defence Line Of Development (DLOD).
A Dependency line may be drawn between two Milestones – this would usually be done between different Projects.
A Diagram Key will be provided, which should indicate the color coding used for Milestones and for Phases.
The user is allowed to control the color of phases, the vertical positioning of projects, the horizontal positioning of milestones, and so on.
The diagram is synchronized with underlying definitions when it is opened, on pressing F3, and on OKing any change to a Project or Milestone definition.